Fold and Form

Fold and Form

Certificates &
Memberships

M. Tucker and Sons install Fold and Form PVC liners as a trenchless rehabilitation method for deteriorated sewer and stormwater pipes.

The process begins with a specially manufactured PVC liner, which is pre-folded into a U-shape to reduce its diameter. The liner is pulled or pushed into the existing pipe and then expanded using heat and pressure. Once heated, the PVC softens and reforms to fit tightly against the host pipe, restoring structural integrity and sealing cracks or defects. After cooling, the liner maintains its new shape, creating a seamless, corrosion-resistant pipe within the original structure.

Fold and Form Fold and Form
Online Enquiry

    Upload your project plan

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    Fold and Form
    Family Owned & Operated
    Fold and Form
    Since 1989
    Fold and Form
    Latest Technology & Equipment
    Fold and Form
    50+ Staff
    Fold and Form
    24/7 Service Availability
    Fold and Form
    ISO Certified

    Our Clients

    Civil and Trenchless Drainage Specialists
    Civil and Trenchless Drainage Specialists
    Civil and Trenchless Drainage Specialists
    Civil and Trenchless Drainage Specialists
    Civil and Trenchless Drainage Specialists
    Civil and Trenchless Drainage Specialists