Urban infrastructure projects require careful planning, skilled project management and a strong understanding of how construction impacts the surrounding community. At M. Tucker & Sons, we pride ourselves on delivering civil construction projects that minimise disruption while providing long-lasting infrastructure improvements.
Our recent laneway resurfacing project at Station Walk, Box Hill, completed for Whitehorse City Council, is a perfect example of this approach. Working within a busy high-density residential precinct, our team successfully resurfaced approximately 80 metres of laneway, ensuring residents maintained access to their homes throughout the entire construction period.
By combining sustainable construction materials, experienced traffic management and staged construction techniques, we delivered a safer, stronger and more environmentally responsible outcome for both Council and the local community.


As suburbs continue to grow and residential density increases, laneways become vital pieces of public infrastructure.
They provide:
When these laneways begin to deteriorate, councils face the challenge of upgrading them without preventing residents from reaching their homes.
This was exactly the challenge presented at Station Walk, Box Hill.
The existing laneway services numerous properties, making uninterrupted access one of the project’s highest priorities.
Unlike many road resurfacing projects where temporary road closures are possible, this project required a far more considered approach.
The laneway services a number of private residences in a high-density housing area, meaning access had to be maintained throughout construction.
Before works commenced, our project team carefully developed staging plans that allowed construction to progress while minimising inconvenience to local residents.
This included:
The result was a project that balanced construction efficiency with community needs.

One of the biggest successes of the Station Walk project was our ability to maintain driveway and garage access throughout the entire six-week construction program.
Rather than closing the entire laneway, works were completed in carefully controlled stages.
This approach allowed residents to continue accessing their properties while construction progressed safely around them.
Maintaining access involved continual coordination between:
This collaborative approach significantly reduced disruption and demonstrated the importance of experienced civil project management.

Sustainability continues to become an increasingly important consideration across civil construction projects.
For this project, M. Tucker & Sons supplied recycled low carbon concrete produced at our own Mt Evelyn concrete plant.
Using lower-carbon concrete helps reduce the environmental footprint of construction while still delivering the structural performance required for long-lasting public infrastructure.
Benefits include:
By producing the concrete ourselves, we were also able to maintain strict quality control and reliable delivery scheduling throughout the project.
This vertical integration provides significant advantages for clients by ensuring materials arrive on time and meet the required specifications.
Concrete remains one of the world’s most widely used construction materials, but traditional cement production contributes significantly to global carbon emissions.
Modern low carbon concrete technologies help address this challenge through improved mix designs and increased recycled material content.
For local councils looking to reduce their environmental impact while continuing to invest in infrastructure, these sustainable alternatives provide a practical solution.
Projects like Station Walk demonstrate how sustainability and performance can work together without compromising quality.
Maintaining safe vehicle and pedestrian movement was another key component of the project.
To achieve this, our specialist M. Tucker & Sons Traffic Control division managed all traffic control requirements throughout construction.
Having our own dedicated traffic management team offers several advantages:
Traffic controllers worked closely with construction crews every day to ensure residents, visitors, contractors and pedestrians could move safely around the worksite.
This integrated approach improves overall project efficiency and reduces unnecessary disruption.
Projects in established residential environments present unique challenges compared to greenfield developments.
Construction teams must consider:
The Station Walk project required careful coordination across all these areas.
Our team’s experience working within live residential environments ensured works progressed smoothly while maintaining positive relationships with local residents.

Laneway resurfacing is about far more than simply replacing worn pavement.
A properly constructed laneway improves:
By investing in quality materials and experienced workmanship, Whitehorse City Council has delivered infrastructure designed to provide reliable service for many years.
One of the strengths of M. Tucker & Sons is our ability to deliver multiple services under one organisation.
For the Station Walk project this included:
Experienced crews completed the staged resurfacing works safely and efficiently.
Our Mt Evelyn concrete plant supplied recycled low carbon concrete specifically suited to the project requirements.
Our dedicated Traffic Control division managed daily traffic movements and resident access.
Bringing these services together under one company creates greater efficiency, improved communication and better project outcomes.
M. Tucker & Sons has built a strong reputation for delivering infrastructure projects for local government across Victoria.
Our teams understand the importance of balancing:
Whether working on roads, drainage, pavements, public spaces or utility infrastructure, our focus remains on delivering practical solutions that benefit local communities.
The use of recycled low carbon concrete on this project highlights the growing role sustainability plays in modern civil construction.
As councils continue working toward environmental targets, construction methods and materials are evolving to reduce emissions without sacrificing performance.
At M. Tucker & Sons, we continue investing in sustainable practices that support these objectives while maintaining the quality and reliability our clients expect.
From laneway resurfacing through to major infrastructure upgrades, M. Tucker & Sons provides comprehensive civil construction services across metropolitan and regional Victoria.
Our capabilities include:
Every project is delivered with a focus on safety, quality, efficiency and long-term value.
The successful completion of the Station Walk, Box Hill laneway resurfacing project demonstrates how thoughtful planning, sustainable construction practices and experienced project management can deliver excellent outcomes for councils and local communities alike.
By maintaining resident access throughout the six-week construction program, supplying recycled low carbon concrete from our Mt Evelyn concrete plant, and coordinating traffic management through our in-house Traffic Control division, M. Tucker & Sons delivered a project that balanced environmental responsibility with practical construction excellence.
If your council, developer or organisation requires an experienced civil construction contractor capable of delivering high-quality infrastructure projects across Victoria, M. Tucker & Sons has the expertise, equipment and integrated services to get the job done safely, efficiently and to the highest standard.